Six phases, each signed off before the next

Discovery, naval architecture, sourcing and construction, systems and interior, launch and trials, then commissioning and handover.

Most build failures are process failures

Timber and laminate rarely fail. What fails is a decision taken twice, or a milestone paid before it was met.

The methodology exists to make each phase produce a document that the next phase depends on, so nothing advances on verbal agreement.

It also means a change request has an obvious cost: you can see exactly which phase it sends you back to.

From brief to handover
6 phases
What each phase must produce
A document
How anything advances
Never verbal
A completed build at sea

The six phases

Each ends with something you sign, not something you are told.

  1. Discovery

    Itinerary, guest count and budget turned into a concept board.

  2. Engineering

    Naval architecture, stability calculations and scantlings resolved.

  3. Sourcing

    Timber or laminate specified and verified, then the keel is laid.

  4. Systems

    Machinery, electrical and interior integrated at Benoa.

  5. Trials

    Launch, sea trials and the defect list that comes with them.

  6. Handover

    Commissioning, documentation, warranty and crew familiarisation.

A change request in phase four costs roughly ten times what the same change costs in phase one. That is the entire argument for a long design phase.

A completed vessel under sail

About the process

See the process applied to your project

Send what you are planning and we will map it against the six phases with real dates.