A supervised build, delivered and at sea

You pay against verified progress

One accountable team between you and the yard: contract structure, milestone payments, weekly reporting, quality inspections and survey coordination.

Most build problems are management problems

Timber and laminate rarely fail. Schedules, specifications and payment discipline do.

Our project managers act as the owner representative inside the network: they hold the yard to the contractual specification, verify each milestone before money moves, and photograph and report weekly.

They also coordinate surveyors, class inspectors and equipment suppliers so decisions never wait on a time zone. For owners building from abroad, this is the difference between supervising a build and hoping about one.

Photographic reporting
Weekly
Each verified before payment
6 milestones
Available if you want it formalised
Escrow
A completed build alongside

Contract and payment stages

Exact splits are contractual and vary by project. The principle does not.

Stage
Signing
Trigger
Contract and specification fixed
Share of contract
10 to 20 percent
Stage
Keel laying
Trigger
Timber or laminate verified on site
Share of contract
15 to 20 percent
Stage
Hull complete
Trigger
Planking or moulding inspected
Share of contract
20 to 25 percent
Stage
Systems installed
Trigger
Engines and electrical commissioned
Share of contract
20 to 25 percent
Stage
Launch and sea trial
Trigger
Trials passed, defects listed
Share of contract
10 to 15 percent
Stage
Handover
Trigger
Documentation and warranty delivered
Share of contract
5 to 10 percent

Funds fall due only as verified progress is reached. Escrow arrangements are available for owners who want payment security formalised through a third party.

What the manager actually holds

Three jobs, none of which the yard foreman can do for you.

The specification

Against the yard

Holding construction to the document you signed, not to what is convenient.

The money

Against progress

Verifying each milestone on site before a payment is released.

The paper trail

For handover

Survey records, class certificates, warranties and defect liability terms.

What handover actually delivers

A document set, not a handshake.

  1. Specification

    The build specification as executed, not as originally drawn.

  2. Survey

    Survey and stability records, and class certificates where applicable.

  3. Warranties

    Engine and systems warranties registered in your name.

  4. Familiarisation

    Crew familiarisation sign off before the boat leaves.

  5. Defects

    The defect liability terms the yard remains bound to.

  6. Registration

    Flag and registration paperwork, Indonesian or offshore.

We manage builds under our own program and, selectively, supervise owner contracted projects at third party yards.

A supervised build under sail after handover

Before you engage one

Engage a project manager

Start with the specification and schedule you already have, whoever is building the boat.